Sunjoy D-GZ844PCO-AS-24 Przewodnik Instalacji Strona 9

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 15
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 8
Fig.12-1: Screw Hook (4L) to Hook Beam (4K).
Fig.12-2: Cover Big Roof Left & Right Cover on the Roof, then Put Big Roof Right Big Cover (4B)
on Big Roof Left Big Cover (4A).
Fig.12-3: Lock Big Roof Left Big Cover (4A) and Big Roof Right Big Cover (4B) to (2A) by using
Bolt (KK) and Flat Washer (BB).
Fig.12-4: Lock Tabletting (4M) to Hook Beam (4K) by using Bolt (KK) and Flat Washer (BB). (The
Tabletting (4M) need to press on the floding of the Cover).
Fig.13-1: Lock Big Roof Left Middle Cover (4C)/ Big Roof Right Middle Cover (4D) and Big Roof Right
Small Cover (4E)/ Big Roof Left Small Cover (4F) to Oblique Beam (2A) by using Bolt (KK) and Flat
Washer (BB).
Fig.13-2: Lock Cover Long Presser (4I) to Decorative Gutter by using Bolt (KK) and Flat Washer (BB).
Przeglądanie stron 8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Komentarze do niniejszej Instrukcji

Brak uwag